The
apartment on minor renovation
The
sound of drilling on the floor
Taking
off the old tiles water cisterns
Knocking
on the doors
The
vibration hit the floors
The
neighbours look up and watch
Every
time they pass the area
The
sound of whisper maybe silent protests
The
air particles floating
The
dust settle on the walls and floors
The
cleaning up will take a day or two
Before
it will be on a clean sheet of satisfaction
The
apartment owner goes to watch
The
contractor and his workers doing the job
Carrying
bags of cement and sand up the steps
It
is heavy with the 50kg bag of cement
He
says it isn't a easy walk up the steps
With
a heavy load it drains out your breath
It
is the work for the able bodied guys
It
will be a breeze for these men
The
apartment unit will be completed
For
now the knocking has been done
The
neighbours on the floors will understand
Living
on highrise buildings
No comments:
Post a Comment